Challenge

A hospital cannot go dark. The existing CHP plant was at the end of its life, but the replacement had to be installed inside the existing plant room while clinical services carried on around it.

Our Solution

The new unit was sized to the existing connections and staged so the old plant carried the load until the moment of changeover. Nothing about the building had to change to accommodate it.

Key Specs

  • 151 kW electrical output
  • Installed within existing infrastructure
  • 235 kW thermal output
  • Zero disruption to hospital operations

Do You Need
a Consultation?

Fill out the form, and our specialist will contact you and answer all your questions.

e.g. type of fuel, required power, project location, planned operating hours per year

Your details are used only to process your request. By submitting this form, you confirm that you have read and agree to our Privacy Policy.

Find your ENERGIN®

Step 1 of 5

Which fuel will you run on?

Determines the engine series and gas train.

Prefer to write to us directly? Contact us